Bay Bridge InfoBay Bridge InfoBay Bridge InfoBay Bridge Info
Bay Bridge Info

The E2 tower is being dismantled, leaving the western part of the cantilever span sitting entirely on falsework (the temporary supports built to hold the bridge structure during demolition). © 2015, Sam Burbank

The E2 tower is being dismantled, leaving the western part of the cantilever spa