The Self-Anchored Suspension Span (SAS) TOWER

CONSTRUCTION UPDATE: Your eyes are not playing tricks on you; the Self-Anchored Suspension (SAS) tower is tilting! But it’s only temporary and there’s a good reason for the leaning tower of the Bay Bridge. As the SAS cable will be anchored into the eastern end of the roadways, the cable will naturally pull to the east. So to properly balance the main cable during installation, crews in September pulled the top of the permanent tower 518 mm to the west, using temporary cables anchored into the bedrock of Yerba Buena Island. Once the cable is in place, the tower will be released to stand up straight once again.
Once the tower leg is vertical, crews detach the pin assembly connecting it to the barge; at that point it is only suspended by the strand jacks, which can hoist 1,455 tons/2.9 million pounds. The first sections are placed onto the tower’s massive marine foundation. These initial segments are slipped onto 150 steel dowels sticking out of the foundation, and fastened with 424 large anchor rods. When sections are stacked on top of each other, they are bolted together using splice plates. The 456 ton cable saddle at the top of the tower is the largest for a suspension bridge.
For more information about the SAS tower, view the fact sheets and press releases in the “Related Resources” section of this page.
Follow the progress of the SAS on the SAS Construction Page.
Follow the action with the Construction Cameras.
- Weight of grillage: 500 tons (1 million pounds)
- Length of grillage:30ftWidth of grillage: 30ft
- Height of grillage: 15ftLength of each leg in Lift 4: 105.6ft
- Weight of each leg of Lift 4: 490.5 tons (981,957 pounds)
- Lifting capacity of strand jacks: 1,455ft (2.9 million pounds)
- Elevation of the operator cab on the tower crane: 560ft
- Elevation of the gantry on the erection tower: 538ft
- Height of tower after fourth lift is in place: 480ft
- Final height of tower when complete: 525ft
- Dimensions of tower’s footing box (marine foundation): 85ft X 73ft
- Thickness of footing box: 21ft
- Number of concrete-filled steel piles supporting footing box: 13
- Depth of piles anchored into bedrock: 196ft